Through harsh winter conditions and extreme summer heat, Onsen drilled more than 2.5 times the height of Mount Everest for one of the UK’s most significant commercial GSHP projects. All delivered on schedule.
We delivered the ground array for the commercial ground source heat pump system for an international bank, including TRT testing, borehole drilling and the installation of 50mm ground loops.
Onsen’s involvement began around 18 months before mobilisation, with early-stage testing and discussions with the site team around project requirements and logistics. This gave the team a detailed understanding of the site well ahead of delivery and allowed them to plan the programme thoroughly from the outset.
One of the main challenges was the ground conditions. The project continued through a particularly wet winter, leaving areas of the site too soft for drilling equipment to move safely and efficiently.
Onsen installed temporary haul roads to maintain access and keep drilling on programme. As the seasons changed, the team also worked through the record-breaking heat and dry conditions of summer 2026.
Our careful site management helped maintain an organised working area throughout the seven-month delivery period, despite the changing conditions.
Quality assurance was maintained across all 110 boreholes, with drilling, loop installation, testing and sign-off recorded throughout. Borehole depths, key dates, photographic evidence and supporting documentation gave the wider project team clear visibility of progress and a detailed record of the completed ground array.


We completed the full ground array on schedule, meeting the programme requirements from mobilisation through to sign-off.
The main contractor and end client provided positive feedback on Onsen’s delivery, recognising the team’s clear communication, coordination and consistent site standards.
The project strengthens our track record in delivering large-scale commercial ground source installations within Tier 1-led programmes.
"Onsen's approach to our client's major decarbonisation project demonstrated the value of early engagement and clear, ongoing communication. They maintained a strong focus on programme delivery, health and safety, compliance and quality throughout a large-scale project, delivered in a sensitive working environment and through some challenging seasonal conditions.
The feedback from our team and client was very positive, particularly around their willingness to work collaboratively, respond to challenges and provide comprehensive quality assurance and handover documentation, making them easy to work with.
Their approach played an important part in ensuring this complex project was delivered successfully and to programme.”
Chris Harris, Managing Director UK Regions at TClarke
“This programme showcases Onsen’s capability at commercial scale. An installation of this size required careful coordination, strong site management, and a team equipped to meet the expectations of major contractors and clients.
It’s a great example of how we’re set up to take on large-scale ground source heat pump installations across the commercial sector.”
- Gareth Berry, Founder at Onsen Energy